Austin, Texas

The Solar Photovoltaic (PV) project at Cedars International Academy consists of 2 arrays that make up a 105.6kW solar plant that will generate approximately 151,473 kWh annually. 50kw of the system make up the roof of a custom-built Schletter carport and the remaining 55kW of system is ballast-mounted on the flat TPO roof of the school. The 423 solar modules used for this installation are PHONO 250W panels and they each utilize Enphase M215 micro inverters to convert the DC to AC electricity.

Read the case study and more about the Cedars International Academy solar PV system here: Austin Texas School Goes Solar

“NATiVE Solar kept me informed throughout the process. They did a quality job initially, and have been great about follow up operations & maintenance.”

Mark Diaz, Superintendent

The Solar Photovoltaic (PV) project at Cedars International Academy consists of 2 arrays that make up a 105.6kW solar plant that will generate approximately 151,473 kWh annually. 50kw of the system make up the roof of a custom-built Schletter carport and the remaining 55kW of system is ballast-mounted on teh flat TPO roof of the school. The 423 solar modules used for this installation are PHONO 250W panels and they each utilize Enphase M215 micro inverters to convert the DC to AC electricity.