Austin, Texas
Music Lab has been providing professional musical equipment and services in Austin, the Live Music Capital of the World, since 1992. In 2015, Music Lab decided to slash their operating costs and reduce their carbon footprint by adding solar to both their Austin locations
The Music Lab Oltorf location has a flush roof mounted 53.865kW solar PV system that utilizes 171 SolarTec 315W solar modules and 2 CPS 23k inverters and produces nearly 75,000kWh a year, saving over $5,000 annually on electric bills.
Check out their St. Elmo solar PV system here: Music Lab (St. Elmo Location)
Providing professional musical equipment and services in Austin, the Live Music Capital of the World, since 1992. In 2015, the company decided to slash their operating costs and reduce their carbon footprint by adding solar to both their Austin locations
Leave A Comment