NATiVE Solar

Home › San Antonio › Commercial Solar

Commercial & Industrial · San Antonio

Commercial Solar & Battery Storage in San Antonio

Solar and battery energy storage (BESS) for San Antonio and South Texas businesses, nonprofits and schools, engineered around your interval data, your CPS Energy rate and current CPS incentive rules.

Installing since 20071,000+ projects60+ MW installedLicensed Texas electrical contractor

Talk with a commercial consultantCommercial solar + storage overview

NATiVE Solar by the numbers

2007
Installing in Texas since
Hundreds
Projects completed
60+ MW
Solar installed
In-house
EPC + O&M

The NATiVE Solar approach

Commercial solar engineered around your meter

NATiVE Solar approaches commercial projects as systems engineering problems, not commodity installs. In San Antonio that means starting with twelve months of interval data, your CPS Energy rate and how it bills demand, and whether your organization qualifies for CPS Energy’s commercial rooftop solar rebate.

Engineering, procurement, construction and long-term operations and maintenance are handled in-house, so one team stays accountable from the first site walk through decades of service.

  • Licensed Texas electrical contractor (TECL-26718)
  • NABCEP-certified professionals
  • Member of the Amicus Solar Cooperative
  • San Antonio commercial projects including Camden Medical Center and four La Fiesta Grocery stores
Rooftop solar on Camden Medical Center in downtown San Antonio
Camden Medical Center, downtown San Antonio: 69 kW, 296 panels.

Know your utility

CPS Energy: one utility, its own rules

CPS Energy is San Antonio’s city-owned utility. Its rates, rebates and interconnection rules apply to your project, and its board decides how statewide grid costs reach your bill.

CPS Energy at a glance

 

Role

Sells and delivers power and handles interconnection. Contractors must be registered with CPS Energy to install solar or batteries.

 

Demand charges

Smaller businesses on the General Service rate pay no separate demand charge. Larger accounts on Large Lighting & Power pay about $10.88 per kW in June–September and $8.16 per kW the rest of the year, based on the highest 15-minute demand. From October through May, billing demand can’t drop below 80% of the previous summer’s peak, so one summer spike sets eight months of charges.

 

Exported solar

CPS Energy nets solar against usage each month. Energy exported beyond what the site uses is credited at CPS’s avoided-cost rate (published at about 1.7¢ per kWh October–May and 2¢ per kWh June–September) on the next bill.

 

Rebates

A commercial rooftop solar rebate for small businesses, schools and nonprofits with systems under 100 kW AC (details below).

Why there’s no retail provider to choose

Texas’s competitive retail market doesn’t include city-owned utilities like CPS Energy. Inside CPS territory, one utility sells and delivers your power, so CPS Energy’s own rates and solar rules decide how a system pays off, not a retail contract.

Outside CPS territory

New Braunfels Utilities, Guadalupe Valley Electric Cooperative, Bandera Electric Cooperative and Pedernales Electric Cooperative serve parts of the region, each with its own rules. NATiVE Solar confirms your utility, rate and interconnection rules for your address before design.

CPS Energy rebate

CPS Energy’s commercial rooftop solar rebate

CPS Energy lists a rooftop solar rebate for small businesses (systems under 100 kW AC), schools and nonprofit organizations. As published, it pays $0.60 per AC watt for the first 25 kW and $0.40 per AC watt above that, plus a $0.10 per AC watt premium for projects using local modules. Rebates are capped at $80,000 or 50% of the invoice cost, whichever is less.

Systems must be installed by a CPS-registered contractor, CPS pays non-local installers 75% of the local rate, and CPS can change guidelines and rebate levels without notice. We confirm current terms and handle the paperwork.

A simple illustration

≈$25,000
potential rebate for an eligible 50 kW-AC system: 25 kW × $0.60/W + 25 kW × $0.40/W
+$5,000
possible local-module premium on the same system at $0.10/W

Illustration only, based on CPS Energy’s published tiers as of October 2026. Eligibility, the installer rate and the 50%-of-invoice cap are determined by CPS Energy.

Proposed · decision expected December 2026

ERCOT 12CP and CPS Energy customers

Texas regulators have proposed dividing statewide transmission costs using twelve monthly peaks (12CP) instead of four summer peaks. CPS Energy customers aren’t billed on 4CP directly, but CPS Energy’s own share of the transmission bill would be set by twelve peaks, and its board would decide how that reaches commercial rates.

Full breakdown: ERCOT 12CP: what the end of 4CP means for Texas facilities.

Demand response & VPP

Putting a commercial battery to work for the grid

Beyond managing demand, a battery energy storage system (BESS) may help a San Antonio business earn CPS Energy demand response rewards for reducing load during summer events. CPS Energy programs include:

CPS Energy · small business

My Business Rewards – Demand Response

Rewards of $73 per kW with 30 minutes’ notice or $70 per kW with 2 hours’ notice (weekdays 1–7 p.m.), plus $10 per kW for optional bonus hours (weekdays 7–10 p.m.), June through September.

CPS Energy · larger facilities

Commercial & Industrial Demand Response

For facilities that can curtail at least 50 kW (or 25 kW per site across four or more sites), all 1–7 p.m.: $47/kW (July–August, 18 events, 2-hour notice), $70/kW (June–September, 25 events, 2-hour notice), $31/kW (June–September, 6 events, 1-hour notice) or $73/kW (June–September, 25 events, 30-minute notice). An evening add-on pays $10/kW for up to 16 events, 7–10 p.m. Full payment for delivering 50–150% of the commitment, with no fees or penalties.

Read the fine print. Demand response pays for reducing grid demand during called events; it is not guaranteed income. Enrolling a battery means keeping capacity available when events are called, which can compete with backup or demand charge goals, and most programs bar enrolling the same site in a conflicting program. CPS Energy’s program page doesn’t say whether batteries qualify. NATiVE Solar confirms eligibility and models the trade-offs before a battery is sized around any program.

Program terms checked against each program’s published materials in October 2026; programs change often and are subject to the provider’s current terms.

What NATiVE Solar builds

Solar, storage and service under one roof

Every system is permitted, built and commissioned by our own crews, then supported by the same team.

 

Rooftop, ground-mount and carport solar

For offices, labs, manufacturing, warehouses, retail, schools, places of worship and multi-site portfolios. Designed around your roof structure, 480 V three-phase service and interconnection requirements.

 

Battery energy storage (BESS)

Sized against twelve months of interval data for demand charge mitigation and load shifting. Backup for selected critical loads is possible, but it is a separate design requirement: a standard grid-tied commercial solar system shuts down during a grid outage. Batteries may also qualify for demand response programs (see below).

 

O&M, repowering and takeovers

Monitoring, preventive maintenance and repairs. We replace end-of-life inverters on aging arrays, as we did for International Biomedical, and take over systems whose original installer is gone.

Incentives & tax rules

Other incentives and tax rules

 

State and local

  • Texas offers a property tax exemption for on-site solar that may apply to qualifying commercial installations.
  • Texas franchise tax rules may allow a deduction for the cost of a solar energy device; ask your tax advisor.
  • CPS Energy rebate eligibility is limited to small businesses, schools and nonprofits; larger projects rely on federal and state tax treatment.

Background: the Texas solar property tax exemption form.

 

Federal tax credit and depreciation

The Section 48E investment tax credit is still available to commercial solar on a tighter schedule. New solar projects that did not begin construction by July 4, 2026 generally must be placed in service by December 31, 2027 to qualify.

Battery energy storage remains eligible on a longer schedule, and foreign-entity (FEOC) sourcing rules now affect equipment selection. Eligibility depends on each project’s facts; confirm with your tax advisor.

More: commercial solar ITC and MACRS depreciation guide.

Permits & approvals

From interval data to permission to operate

NATiVE Solar prepares and submits the drawings, applications and inspection requests, and coordinate shutdowns with your facilities team so the work doesn’t disrupt operations.

1

Data & site review

Twelve months of interval data, a roof and electrical survey, and a review of your CPS Energy rate.

2

Design & applications

Engineering, CPS Energy interconnection and rebate paperwork, and city or county permits.

3

Approval & build

Construction starts once permits and CPS Energy approvals are in place.

4

Inspection & O&M

City inspection, CPS Energy approval to operate, commissioning, then monitoring and maintenance.

  • City of San Antonio: building and electrical permits go through the Development Services Department, followed by city inspection.
  • Surrounding cities: New Braunfels, Boerne, Schertz, Helotes and other cities run their own permitting; unincorporated Bexar County areas follow county requirements.
  • Interconnection: CPS Energy (or your local utility) must approve the system before it is energized.
  • Battery storage: BESS projects may add fire code review, depending on the jurisdiction and where the equipment sits.

Local work

Commercial projects in San Antonio

Camden Medical Center rooftop solar, San Antonio

Downtown San Antonio · Healthcare

Camden Medical Center

69 kW, 296 panels, visible from northbound I-35.

Rooftop solar on La Fiesta Grocery on Marbach Road, San Antonio

San Antonio · Grocery

La Fiesta Grocery, Marbach Road

59.5 kW rooftop array, one of four La Fiesta stores we’ve solarized.

Rooftop solar on La Fiesta Grocery on Nogalitos Street, San Antonio

San Antonio · Grocery

La Fiesta Grocery, Nogalitos

36 kW rooftop array. The chain’s Flores Street (31.5 kW) and Blanco Road (28 kW) stores are also NATiVE projects.

[PLACEHOLDER: Recent San Antonio commercial battery storage or demand charge project: photo, kW / kWh, building type, year, and whether the client can be named]

See the full commercial portfolio →

FAQ

San Antonio commercial solar FAQ

Will commercial solar keep our facility running during an outage?
Not by itself. For safety, a grid-tied solar system shuts down when the grid goes down. Keeping selected loads running requires battery storage and switching equipment designed specifically for backup, which is a separate decision from sizing a system for demand charges.
Does my business qualify for the CPS Energy solar rebate?
CPS Energy currently lists its commercial rooftop solar rebate for small businesses with systems under 100 kW AC, schools and nonprofits. Eligibility and amounts are set by CPS Energy and can change without notice; we confirm current terms before you commit.
Can San Antonio businesses choose a different electricity provider?
Not inside CPS Energy territory. CPS Energy is a city-owned utility outside the competitive retail market, so its rates and rules apply.
Will battery storage lower our demand charges?
It may. How much depends on how sharp and how predictable your facility’s peaks are, your rate and any demand ratchet, and how the system is controlled. We model twelve months of interval data first; for some sites solar alone or load management does the job, and storage waits until the numbers support it.
Can you service or repower a system another company installed?
Yes. We take over, maintain and repower commercial systems from other installers, including companies that are no longer in business.
Is the federal tax credit still available for commercial solar?
Yes, on a tighter schedule. New solar projects that did not begin construction by July 4, 2026 generally must be placed in service by December 31, 2027, and battery storage has a longer runway. Confirm eligibility with your tax advisor.

NATiVE Solar

Talk with NATiVE Solar’s commercial team

Bring a recent CPS Energy bill or twelve months of interval data. We’ll tell you plainly whether solar, storage or both make sense for your facility, and what it would take.

NATiVE Solar  |  San Antonio

© 2026 NATiVE Solar. All rights reserved. Texas-based solar and energy storage contractor since 2007.